Ask
PTESEN

Thursday, September 10, 2026US dollar R$ 5,11₲1.000 R$ 0,87Foz now 20°C cloudy

seguranca ·

Friendship Bridge night maintenance in Foz do Iguaçu

EspañolPortuguês

Marco Três newsroom · edited by Annie Grellmann

Work on Friday (11) with traffic detour and alternating walkways

EPR Iguaçu is performing maintenance on the deck and walkways of the International Friendship Bridge in Foz do Iguaçu on Friday night (11) and early Saturday (12), from 9 p.m. to 5 a.m. The work includes repairs to the customs area and the bridge structure, with vehicle traffic temporarily detoured and pedestrians alternating between the walkways.

Friendship Bridge night maintenance in Foz do Iguaçu
Divulgação / EPR Iguaçu (concessionária da Ponte da Amizade)

The concessionaire EPR Iguaçu, which manages 662 kilometers of highways in western and southwestern Paraná, scheduled conservation interventions on the Friendship Bridge during the period of lowest traffic flow.

The work takes place on two fronts. The first covers spot repairs on the deck of the customs zone, including the covered area, and along the bridge. The second focuses on the upkeep of the pedestrian walkways.

Impact on vehicle traffic

For the deck repairs, there will be a temporary traffic detour with signage and guidance for drivers. The operation was planned to allow maintenance without completely stopping circulation.

Pedestrian circulation

On the walkways, the services occur in an alternating manner: while one is closed for work, the other remains open in both directions. This ensures pedestrians can cross the bridge throughout the intervention.

Authorities from both countries have approved the planning and implementation of the closure.

Useful information

Drivers and pedestrians must obey the signage and follow the instructions of on-site crews. In case of adverse weather conditions, the work will be rescheduled.

For support, the emergency number is 0800 277 0163 (free medical and mechanical assistance). More information is available on the official channels: Instagram and X @epr.iguacu and WhatsApp https://x.gd/bhZS3.

Source: EPR Iguaçu

https://epriguacu.com.br/noticias/epr-iguacu-realiza-manutencao-no-pavimento-da-aduana-e-ponte-da-amizade-nesta-sexta-feira-11

Share

Frequently asked questions

What are the maintenance hours?
The work runs from 9 p.m. on Friday (11) to 5 a.m. on Saturday (12).
Can pedestrians cross the bridge during the maintenance?
Yes. The walkways operate alternately: while one is closed for work, the other stays open for two-way pedestrian traffic.
How can I get support during the work?
Call 0800 277 0163 (free) for medical and mechanical assistance. More information is available on the official channels: @epr.iguacu on Instagram and X, or via WhatsApp https://x.gd/bhZS3.

Still have questions? Ask the border

Marco Três's AI answers instantly, only from verified guides and live data, never made up.

Ask my own question

Read also

Live tools

Saiba de tudo antes de todo mundo

Câmbio, clima e o que importa nos três países, no seu e-mail, todo dia. Gratuito, sem spam.

✓ Marco Três fact-check

Content verified by the newsroom based on an official source: EPR Iguaçu (concessionária da Ponte da Amizade). Last checked: 9/10/2026. Found something inaccurate? We fix it fast. How we work.

Spotted something wrong? Tell us.

AI-automated curation with editorial supervision, your correction or suggestion helps keep things right.